Excavation work continues across the whole of the station box area at the Waterloo station site.
Key activities during standard construction hours include:
- Constructing a shed at the Wellington Street end of the site where equipment will operate within the structure to reduce noise.
- Excavating twin portals at the Wellington Street site boundary with a road header, including rock bolting and concrete work within the excavated cavern.
- Continuing the station box excavation, with excavators, bulldozers and a surface miner.
- Installing ground support concrete and anchoring work, including spraying shotcrete to line the walls of the excavation area.
Low-noise-impact activities will continue until 10pm on weekdays and 6pm on Saturdays.
If you have any questions, please contact the Community Relations Team on 1800 171 386 (24-hour community information line) or tunnels@transport.nsw.gov.au.