Saturday, December 7, 2024
HomeNewsUrban DesignWaterloo metro takes shape

Waterloo metro takes shape

WATERLOO: The 700-unit residential development initially proposed for the three towers over the Waterloo metro station has become a 474-unit student housing tower to the south with a lower large floor plate commercial office building in the north.

The increased commercial space has decreased the residential floor space. Affordable housing is set at a minimum of 5 per cent of residential floor space so it has decreased from 35 to 24. There will be 126 market apartments sitting above the affordable housing in the central tower. Land and Housing Corporation (LAHC) will end up with the 70 social housing units, which sit in the southeast corner of the site.

These changes reduce the number of car spaces from 427 to 155.

The height on the northern tower has dropped 26 metres reducing some morning overshadowing of Alexandria Park. The developers do not need to consider overshadowing by their development on the park proposed by LAHC to the east of the station. This is another consequence of separating the planning for the two sites. The state government handles the station site while council handles the estate.

Changes like the removal of the community centre from the metro plaza and the possibility of increasing the commercial space at the expense of residential were changes that resulted from the initial exhibition.

Other changes come from the developers who successfully bid for the site. The developers had a student-housing provider, Igloo, available to take over part of the site. Mirvac, while a developer, also plans to own and operate the commercial, retail, community and plaza spaces.

It is much easier for the developer to find a childcare centre operator, which is a permitted “community facility”, rather than deal with the complexities of providing a community centre. There will be a 66 square metre community room administered by Mirvac.

It is possible there will be some changes to the final plan from this exhibition but we do now understand what the Waterloo metro will contain and look like.

Many tenants have expressed concern at the latest changes and the implications of having a student and commercial development on their doorstep. Waterloo Public Housing Action Group (WPHAG) has referred to them as Broken Promises.

Council has advised the Waterloo South proposal will not go to Council before Christmas.

_______________
Geoff Turnbull handles SSH Urban Design content and is a co-spokesperson of REDWatch.

 

LEAVE A REPLY

Please enter your comment!
Please enter your name here

spot_img
- Advertisment -spot_img
- Advertisment -spot_img

Volunteers’ News – December 2024

Volunteers’ News – December 2024.

The Birdman of Glebe

GLEBE: Outside Le Petit Tarte Café and Patisserie, most days of the week, is Jethro and his lorikeet, Rosie.

Transforming a Redfern car park into affordable aged care

REDFERN: The City of Sydney is calling for expressions of interest to redevelop a council car park into a not-for-profit aged care facility for at least 50 older people.

Ambour Hardware – end of an era

It’s the end of an era for Redfern. After 55 years of serving the community, Joe and Marie Ambour, longtime owners of Ambour Hardware, are closing the doors.

Living with dementia – a carer’s journey: 11. End of journey

My darling Stuart passed away peacefully on August 27, 2024, the saddest day of my life. The funeral service was a beautiful tribute to his well lived life, thanks to funeral director Stephanie Kelly of www.personalfarewells.com.au, who delivered the service to perfection.

Among the homeless

He caught the apple and threw it back. “It’ll do you good,” she said. He nodded and moved on past her cry of “free fruit!” She was wearing a black tee-shirt with “please don’t forget our homeless” in white letters.